5th October 2018 I now turn to the eccentric the cast parts for the eccentric One side was machine flat and then the part was reversed and was centred in a three draw chuck using a dial test indicator and machine to thickness. |
|
The photo show the part
brought to thickness. |
|
A centre was used to
make the preliminary start for a drill which followed in stages up
to 1/2” and the a boring bar completed the job |
|
Next eccentric centre was machined to size and before parting off and a mark was made on the outer and for the 3/32 inch throw The parting off was then completed. | |
6th October 2018 The Eccentric strap had to be drilled and tapped 7BA so that the link can screw into it and keep in place the strap of the eccentric. |
|
The photo shows the
Eccentric strap and eccentric kept in place by the linkage screwed
into the strap. |
|
The linkage buckle is
the smallest parts I have ever made as it is only 1/4" wide and
3/8" long. It took about 2 hours to make as my vice would not easily hold such a small part. |
|
And to the end of the
linkage which drives then slide valve. |
|